Importing permanent magnets from China follows the same shape as importing any engineered component, with two twists that catch buyers out: magnets have their own air-freight rules, and some grades need export documentation. Everything else is standard component sourcing discipline, which is good news, because the discipline is the part that determines whether the project succeeds.
Step 1: Write the specification before the RFQ
The quality of a magnet import is decided before a supplier is contacted. Specify the duty, not the material: the temperature the magnet will see, the opposing field it might face, the space available, the environment, the volume and the inspection requirement. A specification that says "N42 disc, 20 by 10 mm" invites trouble; one that says "disc of about 20 by 10 mm, holding against steel at 80 degrees, indoor, 5,000 pieces per month, dimensions plus or minus one percent" gets a quotation you can compare. The drawing guide covers what a complete magnet drawing contains.
Step 2: RFQ and compare like with like
Send the specification to several suppliers and compare the answers on the same basis. The comparison points that matter: the grade and its temperature class, the tolerance, the coating and its thickness, the inspection level, the tooling arrangement, the quoted schedule and the price validity. A quotation that is 30 percent cheaper than the others is usually cheaper for a reason that will surface at sampling.
Step 3: Sample and approve
Order samples before committing to production, and check them against the specification rather than against a feeling. Measure the dimensions, check the flux or surface field, fit them in the assembly, and if possible run a short environment test. Approve in writing, with the drawing revision, because the approval is what locks the definition that production will be built to. The sample approval article covers this step in detail.
Step 4: Production and inspection
Production runs on the approved definition, and inspection happens at the end of it. For a first production order, consider a pre-shipment inspection, either by your own agent or by a third party, checking dimensions, flux and packing against the approved sample. Ask for the lot record, which should carry the measured values against your part number.
Step 5: Shipping, and the magnetic-matter rules
Air freight is where magnets differ from ordinary components. Strong magnets are classified as magnetic matter under the air-transport rules, and consignments must be packed and tested so that the field at a specified distance from the package stays below a limit. Where it does not, shielding or a different transport mode is required. Sea freight is far less restricted. Tell the supplier the intended transport mode at quotation stage, because it changes the packing specification and sometimes the price. The shipping declaration article covers the rules in detail.
Step 6: Customs
Magnets fall under the harmonized tariff heading for permanent magnets, with the exact code depending on the material and form. Prepare the usual set: commercial invoice, packing list, and where required a certificate of origin. If the grade contains dysprosium or terbium, or is samarium-cobalt, an export license from the Chinese side is required, and the supplier prepares it. Ask about this early, because license preparation adds time and cannot be retrofitted at the shipping stage.
Payment and risk
Common terms run from full payment in advance for small orders to a deposit with the balance before shipment for larger ones, with letters of credit used where the relationship or the order size justifies the cost. Whichever terms you agree, make them explicit, and make the approval of samples the trigger that moves the order from deposit stage to production stage.
Frequently asked questions
What is the minimum order for custom magnets?It is driven by tooling rather than by material, so a custom pressed part has a real minimum and a stock shape may not. See the MOQ article.
How long does an import take?The quoted schedule covers production; add sampling, inspection, documentation and transit. Ask for a schedule broken into stages rather than a single number.
Can I ship samples by air cheaply?Yes, in most cases, because a small sample package rarely approaches the field limits. Declare them properly anyway.
What if the parts arrive out of specification?This is why approval in writing and a pre-shipment inspection matter. A defined specification and an approved sample turn a dispute into a measurable comparison.
Ready to start a magnet import? Send us the specification and we will quote against it with a staged schedule. For the supplier-side view, see global shipping and logistics.