The minimum order quantity for a custom magnet is one of the first questions a buyer asks, and the answer usually sounds arbitrary until you see what has to be built before a single part can be pressed. Magnet MOQ is a tooling question, and tooling is a fixed cost that has to be recovered over a known number of parts.
What has to be built first
A custom pressed part needs a die, which is a precision tool machined to the part's profile and then proven out. A multipole part needs a magnetizing fixture with positioned pole pieces. Parts with ground features need grinding fixtures. Each of these is a one-off cost, and none of them is cheap. The MOQ exists so that the tooling cost divided by the order quantity gives a unit price that is still a magnet price rather than a tooling price.
Why stock geometries have no MOQ
A stock disc, block, ring or arc in a standard size uses a die that is already built and already amortized across thousands of orders. The supplier is selling parts from an existing tool, so the only question is whether the quantity is worth setting up the run. That is why stock shapes can be ordered in small quantities and custom shapes cannot, and it is why the first question a supplier asks about a new part is whether an existing tool covers it.
How tooling is charged
Two models exist, and they are worth distinguishing. In the first, the tooling is amortized into the unit price, and the unit price falls as the volume grows; the supplier keeps the tool and you benefit from the volume. In the second, the tooling is charged as a one-off, and the unit price is lower from the first part; you may own the tool, or the supplier may hold it against your exclusivity. Ask which model applies, because it changes how you should structure a multi-year program.
The sintering batch reality
Beyond tooling, sintered parts are made in batches. Pressing, sintering and grinding all have setup times and minimum efficient runs, and a batch that is too small wastes furnace capacity and grinding time. This is a secondary contributor to MOQ, usually smaller than the tooling but real, and it is why "can you just press ten" has a different answer from "can you press ten thousand".
How to reduce the effective MOQ
- Start from stock geometry. A standard disc with a pressed countersunk is cheaper than a custom profile, and often close enough.
- Combine sizes in one tool. A family of parts that share a press setup reduces the per-part setup cost.
- Order unmagnetized blanks. Block blanks can be machined in-house, which trades supplier MOQ for your own machining capacity.
- Plan the program. A committed annual volume with staged releases gets a better arrangement than a single speculative order.
- Sample separately. Samples are a different economic question from production, and most suppliers handle them as a development cost.
What to ask
Ask whether an existing tool covers the part. Ask whether tooling is amortized or charged separately. Ask what the unit price would be at double and ten times the quantity. Ask what changes if the program runs for three years. The answers tell you more about a supplier than the headline MOQ does.
Frequently asked questions
Is a high MOQ a red flag?Not by itself. A high MOQ on a complex custom part is normal. A high MOQ on a stock shape is worth questioning.
Can I get samples without meeting the MOQ?Yes. Samples are usually handled separately, either as a development charge or as a credit against the first production order.
What happens if I cancel after the tool is built?The tooling cost is usually owed, because it cannot be resold. This is why sample approval should precede the production commitment.
Does a bigger order always get a lower unit price?Almost always, through tooling amortization and batch efficiency, but ask for the volume breaks rather than assuming them.
Planning a custom part? Send the drawing and the annual volume and we will quote the tooling and the volume breaks separately.